Welcome to the UKWA Home Page › Forums › Technical › 2nd Reef Line Rigging. › Reply To: 2nd Reef Line Rigging.
02/08/2007 at 12:51 pm #5630
Member
Matt,
Normally the luff is held in place by a pin through the front end of the boom fitting. There is a small (and frankly not very efficient) single cow horn on the stbd side for the reef cringles. I lower the main, place the cringle on the cow horn and then retension the main when reefing.